A cubic yard is a cube 3 feet on each side: 27 cubic feet. To get cubic yards, multiply length × width × depth in feet and divide by 27. A 12 × 10 ft area 4 inches deep is 12 × 10 × 4/12 = 40 cubic feet, which is 1.48 cubic yards. The calculator above does this for any number of areas of different shapes, each with its own depth, and adds them up in cubic yards, cubic feet and cubic meters.
How the calculator works
Add an area for each part of the job: a rectangle for a bed or a slab, a circle for a round patio or a post hole, a triangle for a corner, and a ring for mulch or rock around a tree. Enter the sizes in feet and inches and the depth in inches, or switch to metric. For identical areas, such as a row of post holes, enter one and set how many. The calculator shows each area's volume and the total, adds a waste allowance if you set one, and, if you pick a material, its weight and the truck loads.
Area of each shape
| Shape | Area | Example |
|---|---|---|
| Rectangle | length × width | 12 × 10 ft = 120 ft² |
| Circle | 3.1416 × diameter² ÷ 4 | 10 ft across = 78.5 ft² |
| Triangle | base × height ÷ 2 | 8 × 6 ft = 24 ft² |
| Ring | 3.1416 × (outer² − inner²) ÷ 4 | 6 ft around a 1 ft trunk = 27.5 ft² |
From area to cubic yards
Volume is area × depth. Depth is usually measured in inches, so divide it by 12 to get feet: 4 inches is 0.333 ft, 6 inches is 0.5 ft. Area in square feet times depth in feet is cubic feet; divide by 27 for cubic yards. A quicker rule: one cubic yard spread 1 inch deep covers 324 square feet, so at any depth it covers 324 ÷ depth in inches.
| Depth | One cubic yard covers | Cubic yards per 100 ft² |
|---|---|---|
| 1 in | 324 ft² | 0.31 |
| 2 in | 162 ft² | 0.62 |
| 3 in | 108 ft² | 0.93 |
| 4 in | 81 ft² | 1.23 |
| 6 in | 54 ft² | 1.85 |
| 12 in | 27 ft² | 3.70 |
Several areas
Most real jobs are not one rectangle. A driveway with a turnaround, a patio with a round end, a bed that wraps a tree: split it into simple shapes, enter each, and the calculator sums them. Where the depth changes from one end to the other, use the average depth of that part.
Cubic meters
One cubic yard is 0.7646 cubic meters, and one cubic meter is 1.308 cubic yards. The calculator shows both, so you can order from a supplier who quotes in either.
Cubic yards to tons
Gravel, sand and soil are often sold by the ton. To convert, multiply cubic yards by the material's weight per yard: about 1.4 tons for crushed stone, 1.35 for sand and pea gravel, 1.1 for fill dirt, 1 for topsoil, 0.4 for mulch and about 2 for concrete. Pick the material under "Weight of" and the calculator does it; for more materials and for the conversion back, use the Cubic Yards to Tons Calculator.
How much extra to order
Volume from dimensions is exact, but the job is not. Concrete needs 5 to 10 % for spillage and an uneven base. Crusher run, fill dirt and topsoil compact, so order 10 to 20 % more loose material than the finished volume. Mulch and rock need about 5 %. Enter the allowance as the waste percentage, or use the calculator for the material, which adds the right one by default: Concrete Calculator, Gravel Calculator, Topsoil Calculator, Mulch Calculator.
Common mistakes
- Multiplying feet by inches. 12 × 10 × 4 = 480 is not cubic feet; the 4 inches must become 0.333 ft first.
- Dividing by 9 instead of 27. Nine converts square feet to square yards; cubic yards need 27.
- Using the diameter as the radius for a circle. A 10 ft circle has a 5 ft radius and an area of 78.5 ft², not 314.
- Forgetting a second area or counting a shared corner twice. Sketch the job and number the parts.