Cubic Yard Calculator: any shape, several areas

How it's calculated. Cubic yards = length × width × depth in feet ÷ 27. With the depth in inches, divide it by 12 first. A cubic yard is 3 ft × 3 ft × 3 ft = 27 ft³.
12' × 10' × 4" = 12 × 10 × 0.333 = 40 ft³ ÷ 27 = 1.48 yd³
01

Areas to fill

Shape
ftin
ftin
in
02

Material and allowance

%
03

Delivery

yd³
Total volume
1.48yd³
Rectangle 12' 0" × 10' 0" × 4"
Cubic feet40 ft³
Cubic meters1.13 m³
Total area120 ft²
Truck loads1 · limited by body volume
Pure geometry: volume = area × depth

Areas to scale

120 ft² · 1.48 yd³
PLAN, EACH AREA TO ITS OWN SCALE12' 0" × 10' 0"depth 4" = 1.48 yd³DELIMETRA · FT-IN
ft³ = area × depth; yd³ = ft³ ÷ 27Formula120 ft²Total area40 ft³Cubic feet1Truck loads
Your local prices
$
$

Prices are not pre-filled: material and delivery prices differ by region.

How we calculate

Each area: rectangle length × width, circle π × diameter² ÷ 4, triangle base × height ÷ 2, ring π × (outer² − inner²) ÷ 4. The area times its depth and its count is its volume.

Units are converted for you: feet × feet × inches ÷ 12 gives cubic feet, cubic feet ÷ 27 give cubic yards, cubic yards × 0.7646 give cubic meters.

The waste allowance is added to the total. For material that compacts, such as crusher run, fill dirt or topsoil, add 10 to 20 % here, or use the material's own calculator, which adds it for you.

Weight is the volume times a typical loose density; quarries and soil yards print the real one on the ticket. Truck loads are limited by body volume or payload, whichever runs out first.

Total
1.48yd³

A cubic yard is a cube 3 feet on each side: 27 cubic feet. To get cubic yards, multiply length × width × depth in feet and divide by 27. A 12 × 10 ft area 4 inches deep is 12 × 10 × 4/12 = 40 cubic feet, which is 1.48 cubic yards. The calculator above does this for any number of areas of different shapes, each with its own depth, and adds them up in cubic yards, cubic feet and cubic meters.

How the calculator works

Add an area for each part of the job: a rectangle for a bed or a slab, a circle for a round patio or a post hole, a triangle for a corner, and a ring for mulch or rock around a tree. Enter the sizes in feet and inches and the depth in inches, or switch to metric. For identical areas, such as a row of post holes, enter one and set how many. The calculator shows each area's volume and the total, adds a waste allowance if you set one, and, if you pick a material, its weight and the truck loads.

Area of each shape

ShapeAreaExample
Rectanglelength × width12 × 10 ft = 120 ft²
Circle3.1416 × diameter² ÷ 410 ft across = 78.5 ft²
Trianglebase × height ÷ 28 × 6 ft = 24 ft²
Ring3.1416 × (outer² − inner²) ÷ 46 ft around a 1 ft trunk = 27.5 ft²

From area to cubic yards

Volume is area × depth. Depth is usually measured in inches, so divide it by 12 to get feet: 4 inches is 0.333 ft, 6 inches is 0.5 ft. Area in square feet times depth in feet is cubic feet; divide by 27 for cubic yards. A quicker rule: one cubic yard spread 1 inch deep covers 324 square feet, so at any depth it covers 324 ÷ depth in inches.

DepthOne cubic yard coversCubic yards per 100 ft²
1 in324 ft²0.31
2 in162 ft²0.62
3 in108 ft²0.93
4 in81 ft²1.23
6 in54 ft²1.85
12 in27 ft²3.70

Several areas

Most real jobs are not one rectangle. A driveway with a turnaround, a patio with a round end, a bed that wraps a tree: split it into simple shapes, enter each, and the calculator sums them. Where the depth changes from one end to the other, use the average depth of that part.

Cubic meters

One cubic yard is 0.7646 cubic meters, and one cubic meter is 1.308 cubic yards. The calculator shows both, so you can order from a supplier who quotes in either.

Cubic yards to tons

Gravel, sand and soil are often sold by the ton. To convert, multiply cubic yards by the material's weight per yard: about 1.4 tons for crushed stone, 1.35 for sand and pea gravel, 1.1 for fill dirt, 1 for topsoil, 0.4 for mulch and about 2 for concrete. Pick the material under "Weight of" and the calculator does it; for more materials and for the conversion back, use the Cubic Yards to Tons Calculator.

How much extra to order

Volume from dimensions is exact, but the job is not. Concrete needs 5 to 10 % for spillage and an uneven base. Crusher run, fill dirt and topsoil compact, so order 10 to 20 % more loose material than the finished volume. Mulch and rock need about 5 %. Enter the allowance as the waste percentage, or use the calculator for the material, which adds the right one by default: Concrete Calculator, Gravel Calculator, Topsoil Calculator, Mulch Calculator.

Common mistakes

Questions

How do you calculate cubic yards?

Multiply length × width × depth in feet to get cubic feet, then divide by 27. A 12 × 10 ft area 4 in deep is 12 × 10 × 0.333 = 40 ft³, or 1.48 yd³.

How many cubic feet are in a cubic yard?

27, because a cubic yard is a cube 3 ft on each side: 3 × 3 × 3 = 27 ft³.

How many square feet does a cubic yard cover?

324 ft² at 1 in deep, 162 ft² at 2 in, 108 ft² at 3 in, 81 ft² at 4 in and 54 ft² at 6 in.

How do I calculate cubic yards for a circle?

Area = 3.14 × radius², then × depth in feet ÷ 27. A circle 10 ft across and 3 in deep is 78.5 × 0.25 = 19.6 ft³, or 0.73 yd³.

How many cubic yards are in a ton?

It depends on the material: about 0.71 yd³ per ton of gravel, 0.9 of fill dirt, 1 of topsoil, 2.5 of mulch. Use a material's density to convert.

How do I convert cubic yards to cubic meters?

Multiply by 0.7646. One cubic meter is 1.308 cubic yards.

Should I order extra?

For concrete, 5 to 10 %. For gravel, dirt and topsoil that compact, 10 to 20 %. For mulch and rock, about 5 %.

Related calculators