Paver Calculator: pavers, base and sand

How it's calculated. Pavers = area × pavers per square foot × (1 + allowance). Pavers per square foot = 144 ÷ (length + joint) × (width + joint) in inches: a 4 × 8 Holland paver lays 4.5 per ft².
20' × 10' = 200 ft² × 4.5 = 900 → +10 % = 990 pavers; 6" base = 4.26 yd³ of crusher run with compaction
01

Area

Start from
ftin
ftin
02

Pavers and pattern

in
in
%
03

Base, sand and edging

in
in
%

Crushed stone with fines (crusher run, ¾ in minus) compacted in 2–4 in lifts. Add depth over clay and in cold climates.

ftin
ftin
in
Pavers to buy
990pavers
Holland 4 × 8 (3⅞ × 7⅞ in) · Running bond or stack · 200 ft²
Pavers per square foot4.5
Area200 ft²
Bedding sand0.68 yd³ · 0.92 ton
Base (crusher run)4.26 yd³ · 6.18 ton
Polymeric joint sand5 bags of 50 lb
Edge restraint8 × 8' 0" · 60 spikes
Dig depth9⅜"
Soil to remove5.79 yd³
Typical US installation: 1 in of sand on a compacted crushed stone base

Pattern and section

Holland 4 × 8 (3⅞ × 7⅞ in) · 9⅜"
PATTERNSECTIONpavers · 2⅜"bedding sand · 1"compacted base · 6"compacted subgradeedge restraint + spikeDELIMETRA · FT-IN
pavers = area × per ft² × (1 + allowance)Formula4.5Pavers per square foot6.18 tonBase (crusher run)9⅜"Dig depth
Your local prices
$
$
$
$
$
$

Prices are not pre-filled: paver, stone and sand prices differ by region and supplier.

How we calculate

Pavers per square foot = 1 ÷ the laying module: the paver plus one joint each way. A 3⅞ × 7⅞ in Holland paver with a ⅛ in joint lays on a 4 × 8 in module, 4.5 per square foot. Hexagons: module area = 0.866 × (width across flats + joint)².

Count = area × pavers per square foot × (1 + breakage allowance) × (1 + pattern cuts), rounded up. Herringbone adds about 10 % for cuts, 45° and diagonal layouts about 15 %.

Bedding sand = area × depth, plus 10 % because it is screeded loose. Base = area × compacted depth × (1 + compaction allowance): crusher run loses about 15 % when compacted. Weights use typical densities (concrete sand 1.35, crusher run 1.45 tons per yard).

Joint sand fills the joints to the paver's full thickness: area × thickness × joint share of the module, plus 10 % swept off, at about 100 lb per cubic foot. The dig depth is paver + bedding + base; the soil comes out as in-ground volume and swells about 25 % in the truck.

Pavers
990pavers

A 10 × 20 ft patio of standard 4 × 8 inch Holland pavers takes 900 pavers, because they lay 4.5 to the square foot with their joints. With 10 % for breakage and cuts you buy 990. Under them go about 0.7 cubic yards of bedding sand and, for a 6 inch compacted base, about 4.3 cubic yards of crusher run, a little over 6 tons. The calculator above does this for any size, format, joint, pattern and base, and adds the joint sand, the edge restraint and how deep to dig.

How the calculator works

Enter the length and width of the area, or the area itself, and choose patio or driveway: that sets the paver thickness and the base depth, which you can change. Pick the paver format or enter your own size, the joint width and the pattern. In the last step set the bedding sand, the base and the edges that need restraint. The result is the pavers to buy and every material under and around them.

Pavers per square foot

Pavers lay on a module: the paver plus one joint each way. Holland pavers are made 3⅞ × 7⅞ inches so that with a ⅛ inch joint they lay on an exact 4 × 8 inch module, and 144 ÷ 32 = 4.5 per square foot. Hexagons lay at 0.866 × (width across flats + joint)², which for an 8 inch hexagon is about 2.5 per square foot.

Paver (nominal)Per square footPer 100 ft²
4 × 8 in Holland4.50450
4 × 4 in cobble9.00900
6 × 6 in4.00400
6 × 9 in2.67267
12 × 12 in1.00100
16 × 16 in slab0.5656
24 × 24 in slab0.2525

Allowance and pattern

The count is area × pavers per square foot × (1 + breakage allowance) × (1 + pattern cuts), rounded up. Running bond and stack bond only need cuts along the edges. A 90° herringbone adds about 10 % because every edge is cut on a slant, and a 45° herringbone or a diagonal layout about 15 %. Tumbled and irregular pavers chip more in handling; keep a few spares for later repairs, since colors change between production runs.

What goes under the pavers

A paver surface is only as good as its base. The usual US installation, as the paver industry (ICPI, now CMHA) describes it, is a compacted crushed stone base, a 1 inch layer of coarse sand screeded flat, the pavers, and sand swept into the joints.

How deep to dig

Dig depth = paver thickness + bedding sand + base, measured from the finished surface. For a patio of 2⅜ inch pavers: 2⅜ + 1 + 6 = 9⅜ inches. The soil you remove swells by about a quarter when dug, so plan the truck for more than the hole; the Dirt Calculator works it out. Keep the finished surface falling at least 2 % away from the house, which you can check with the Slope Calculator.

Common mistakes

Questions

How many pavers do I need for a 10 × 20 patio?

200 ft² of 4 × 8 in pavers is 900 at 4.5 per ft²; with 10 % for breakage and cuts, buy 990. In herringbone, add another 10 %.

How many pavers are in a square foot?

4.5 of 4 × 8 in, 9 of 4 × 4, 4 of 6 × 6, 2.67 of 6 × 9, 1 of 12 × 12, 0.56 of 16 × 16 and 0.25 of 24 × 24, counting the joint.

How much base do I need under pavers?

Typically 4 to 6 in of compacted crushed stone for a patio or walkway and 8 to 12 in for a driveway, more on clay and in cold climates. 6 in under 200 ft² is 3.7 yd³ compacted, about 4.3 yd³ loose.

How much sand goes under pavers?

A 1 in screeded layer of coarse concrete sand: 0.62 yd³ per 200 ft², about 0.68 yd³ with 10 % extra.

How much polymeric sand do I need?

It depends on joint width and paver thickness. A 200 ft² patio of 2⅜ in Holland pavers with ⅛ in joints takes about 200 lb, four to five 50 lb bags; wider joints and tumbled pavers take more.

How deep do I dig for pavers?

Paver thickness + 1 in of sand + the base. For a patio: 2⅜ + 1 + 6 = about 9½ in below the finished surface.

How much extra should I order for herringbone?

About 10 % more than running bond for a 90° herringbone, and about 15 % for a 45° herringbone or a diagonal layout, on top of the breakage allowance.

Related calculators