A 10 × 20 ft patio of standard 4 × 8 inch Holland pavers takes 900 pavers, because they lay 4.5 to the square foot with their joints. With 10 % for breakage and cuts you buy 990. Under them go about 0.7 cubic yards of bedding sand and, for a 6 inch compacted base, about 4.3 cubic yards of crusher run, a little over 6 tons. The calculator above does this for any size, format, joint, pattern and base, and adds the joint sand, the edge restraint and how deep to dig.
How the calculator works
Enter the length and width of the area, or the area itself, and choose patio or driveway: that sets the paver thickness and the base depth, which you can change. Pick the paver format or enter your own size, the joint width and the pattern. In the last step set the bedding sand, the base and the edges that need restraint. The result is the pavers to buy and every material under and around them.
Pavers per square foot
Pavers lay on a module: the paver plus one joint each way. Holland pavers are made 3⅞ × 7⅞ inches so that with a ⅛ inch joint they lay on an exact 4 × 8 inch module, and 144 ÷ 32 = 4.5 per square foot. Hexagons lay at 0.866 × (width across flats + joint)², which for an 8 inch hexagon is about 2.5 per square foot.
| Paver (nominal) | Per square foot | Per 100 ft² |
|---|---|---|
| 4 × 8 in Holland | 4.50 | 450 |
| 4 × 4 in cobble | 9.00 | 900 |
| 6 × 6 in | 4.00 | 400 |
| 6 × 9 in | 2.67 | 267 |
| 12 × 12 in | 1.00 | 100 |
| 16 × 16 in slab | 0.56 | 56 |
| 24 × 24 in slab | 0.25 | 25 |
Allowance and pattern
The count is area × pavers per square foot × (1 + breakage allowance) × (1 + pattern cuts), rounded up. Running bond and stack bond only need cuts along the edges. A 90° herringbone adds about 10 % because every edge is cut on a slant, and a 45° herringbone or a diagonal layout about 15 %. Tumbled and irregular pavers chip more in handling; keep a few spares for later repairs, since colors change between production runs.
What goes under the pavers
A paver surface is only as good as its base. The usual US installation, as the paver industry (ICPI, now CMHA) describes it, is a compacted crushed stone base, a 1 inch layer of coarse sand screeded flat, the pavers, and sand swept into the joints.
- Base: crushed stone with fines, sold as crusher run, ¾ inch minus or road base, compacted in lifts of 2 to 4 inches. Typical depths are 4 to 6 inches for patios and walkways and 8 to 12 inches for driveways, more over clay or where the ground freezes deeply. It loses about 15 % of its loose volume when compacted, and the calculator adds that. Figure other base stone in the Gravel Calculator.
- Bedding sand: 1 inch of coarse washed concrete sand, screeded and never compacted before the pavers go down. The calculator adds 10 % because it is placed loose.
- Joint sand: polymeric sand fills the joints to the full paver thickness. Its volume is the joint share of the surface × the paver thickness: about 4.6 % of the surface for Holland pavers with ⅛ inch joints. At about 100 lb per cubic foot, a 200 ft² patio of 2⅜ inch pavers needs about 200 lb, four or five 50 lb bags. Wider joints and tumbled edges need much more.
- Edge restraint: plastic or aluminum edging spiked into the base every 12 inches holds the field together. Leave out edges against the house, a wall or a curb.
How deep to dig
Dig depth = paver thickness + bedding sand + base, measured from the finished surface. For a patio of 2⅜ inch pavers: 2⅜ + 1 + 6 = 9⅜ inches. The soil you remove swells by about a quarter when dug, so plan the truck for more than the hole; the Dirt Calculator works it out. Keep the finished surface falling at least 2 % away from the house, which you can check with the Slope Calculator.
Common mistakes
- Counting pavers from their actual size without the joint, which overstates the count by a few percent, or from the nominal size with a wide joint, which understates it.
- Skimping on base depth on a driveway. Thin bases rut under tires within a season.
- Compacting the bedding sand before laying, or using it to fill low spots in the base. Fix the base instead.
- Ordering joint sand by the bag coverage for a different paver. Thickness and joint width change it several times over.