Footing Calculator: concrete, rebar and stem wall

How it's calculated. Concrete = footing length along the centerline × (footing width × thickness + stem thickness × stem height), plus waste. A 40 × 30 ft building has 140 ft of footing.
140' × (20" × 10" + 8" × 24") = 194 + 187 ft³ = 14.1 yd³ → +10 % = 15.5 → order 15¾ yd³
01

Layout

Layout

Footing around a rectangular building, measured along its centerline.

ftin
ftin
02

Footing and stem wall

in
in
in
in
in
in
in
03

Reinforcement

pcs
pcs
db
Footing bar size
Stem bar size
Vertical dowels90° hook in the footing (12 bar diameters, ACI 318-19 Table 25.3.1), up the stem to 2 in below the top.
Dowel size
04

Concrete and soil

%
lb/ft
Ready-mix to order
15.75yd³
140' 0" · 20" × 10" + 8" × 24"
Footing length140' 0"
Footing7.2 yd³
Stem wall6.91 yd³
Truck order (¼ yd³ steps)15.75 yd³
Rebar, 20 ft bars37 · 20 footing · 11 stem · 6 dowels
Lap splices18
Rebar weight494 lb
Form area, both sides793 ft²
Pressure on soil245 psf
Size and depth meet IRC R403.1; 245 psf on soil rated 1,500 psf

Section, plan and 3D model

140' 0" · 20" × 10" + 8" × 24"
SECTIONgradefrost depth20" × 10"8" × 24"PLAN40' 0"30' 0"DELIMETRA · FT-IN
Drag to rotate · scroll to zoom
L × (w × t + stem)Formula140' 0"Length14.12 yd³Concrete245 psfPressure on soil
Your local prices
$
$
$

Prices are not pre-filled: concrete and rebar prices differ by region.

How we calculate

Footing length is the perimeter along the centerline (2 × (length + width)), plus the interior wall when there is one. Measuring on the centerline makes the corners come out right: what the outside corner gains, the inside corner loses.

Concrete = length × (footing width × thickness + stem thickness × stem height), plus waste, in bags or a ready-mix order rounded up to quarter yards.

Horizontal bars run along each side; a side longer than the stock bar is spliced, every splice adding one lap. Corner bars are L-shaped, one at every corner and tee per bar, with legs of one lap each way, as the donor detailed them. Bars to buy come from a cutting plan.

Dowels tie the stem to the footing: a 90° hook with a 12 bar-diameter extension (ACI 318-19 Table 25.3.1) at the bottom, 3 in of cover under it, up the stem to 2 in below its top.

Pressure on soil = concrete weight per foot (150 lb/ft³) plus the wall load, over the footing width, compared with the presumptive values of IRC Table R401.4.1. Minimum width, thickness, projection and depth follow IRC R403.1; the width a building needs comes from the code tables or the engineer.

To order
15.75yd³

A 40 × 30 ft house on a 20 × 10 in continuous footing with an 8 in stem wall 24 in tall needs 140 feet of footing and 14.1 cubic yards of concrete: 194 cubic feet in the footing and 187 in the stem. With 10 % waste that is a 15¾-yard ready-mix order. Two #4 bars in the footing, one at the top of the stem, corner bars and #4 dowels every 48 in come to 37 bars of 20 ft, about 494 lb. The calculator above works this out for any rectangle, a rectangle with an interior bearing wall, or any footing length.

How the calculator works

Choose the layout and enter the building size, or the total footing length for an irregular outline. Enter the footing width and thickness and, if there is one, the stem wall. Then the bars, how you buy the concrete, the wall load and the soil. The calculator gives the concrete, the bars to buy, the forms, and checks the footing against the IRC minimums and the soil.

Footing length

Footings are measured along their centerline: 2 × (40 + 30) = 140 ft for the default house. On the centerline the corners take care of themselves, since what the outside corner gains the inside corner loses. An interior bearing wall across the width adds its length, 30 ft here.

Concrete

The footing is length × width × thickness, the stem length × thickness × height. 140 × (20/12) × (10/12) = 194.4 ft³ for the footing and 140 × (8/12) × 2 = 186.7 ft³ for the stem, 381 ft³ or 14.1 yd³ in all. Add 5 to 10 % for trench walls that are not straight and what stays in the chute.

Reinforcement

Horizontal bars run along each side. A 40 ft side is longer than a 20 ft bar, so each bar along it needs two lap splices, each 40 bar diameters (20 in for #4) by default; a 30 ft side needs one. Corner bars are bent L-bars at each corner and tee with legs one lap long each way, so the steel is continuous around the corner. Dowels tie the stem wall to the footing: each has a 90° hook at the bottom with an extension of 12 bar diameters (ACI 318-19 Table 25.3.1), sits on 3 in of cover and runs up to 2 in below the top of the stem. The bars to buy come from a cutting plan, offcuts included.

What the IRC requires

The prescriptive footing sizes in IRC Tables R403.1(1) to R403.1(3) depend on the number of stories, the wall construction, the snow load and the soil, so the calculator takes the width from your drawings instead of guessing it. It checks the absolute minimums the IRC sets for every footing:

Pressure on the soil

The concrete alone weighs 150 lb per cubic foot. The default footing and stem weigh 408 lb per foot of length, spread over a 20 in footing: 245 psf. Enter the wall load per foot from the structural drawings, the weight of the walls, floors and roof the footing carries, and the calculator adds it before comparing with the soil.

Common mistakes

For the slab inside the footing, use the Concrete Slab Calculator; for the bars alone, the Rebar Calculator; for a block stem wall, the Concrete Block Calculator.

Questions

How much concrete do I need for a footing?

Length × width × thickness. 140 ft of 20 × 10 in footing is 194 ft³, 7.2 cubic yards; an 8 × 24 in stem wall on it adds 187 ft³, 6.9 yards.

What is the minimum footing size under the IRC?

12 in wide and 6 in thick (IRC R403.1.1). The width a house needs depends on stories, wall type, snow load and soil (Tables R403.1(1)–(3)).

How deep should a footing be?

At least 12 in below undisturbed ground and below the local frost line (IRC R403.1.4). Frost depth is set by your building department.

How much rebar goes in a footing?

Commonly two #4 bars continuous in the footing, with corner bars and laps of 40 bar diameters (20 in for #4). Seismic and engineered footings may need more; the drawings govern.

How far should a footing extend past the wall?

At least 2 in on each side and not more than the footing thickness (IRC R403.1.1).

What soil pressure can a footing use?

Without a soil test the IRC presumes 1,500 psf for clay and silt, 2,000 psf for sand and 3,000 psf for gravel (Table R401.4.1).

How long are footing dowels?

Long enough to hook into the footing and reach near the top of the stem. In a 10 in footing under a 24 in stem a #4 dowel with a 6 in (12 db) hook is about 35 in.